Total area: 130m2

Type of construction: Single-storey residential building

Construction period with ICF: 5 weeks (9 days for foundation construction including earthworks,

foundation footing, installation of utility ducts; 15 days – wall construction)

Foundation construction: strip foundation, ICF blocks MC100 (total insulation layer 150mm) and MC50

Wall construction: ICF blocks MC20 (total insulation layer 250mm) and MC5

(total insulation layer 100mm)

Number of workers involved in construction: 2